New Schools

To accommodate the growing student population, this bond proposal includes funding for a new comprehensive high school (HS #4), a new middle school (MS #8), four new elementary schools, two replacement campuses (Justin ES and Prairie View ES), and four early childhood centers.

Headers_Props.jpg
 

Comprehensive High School #4

Alleviate overcrowding at Byron Nelson HS, Eaton HS and Northwest HS and balance enrollment at high schools.

Potential Opening: 2026-2027

Location: N. Riverside Dr.

In Fort Worth, near I-35W and SH 170

 

Map may not show exact location and is for reference purposes only.

 

Middle School #8

Alleviate overcrowding at Pike MS.

Potential Opening: 2026-2027

Location: Pecan Square

In Northlake, near I-35W and 407

 

Map may not show exact location and is for reference purposes only.

 

Elem. School #23 (Perrin ES)

Alleviate overcrowding at Clara Love ES.

anticipated Opening: august 2024

Location: wildflower ranch

In Fort Worth, on SH 114, west of Justin

 

Map may not show exact location and is for reference purposes only.

 

Elem. School #24

Potential Opening: 2025-2026

Location: TBD

Location could be along the 287 corridor in the Fort Worth / Haslet area

 

Elem. School #25

Potential Opening: 2025-2026

Location: TBD

Location could be along the 287 corridor in the Fort Worth / Haslet area

 

Elem. School #26

Potential Opening: 2026-2027

Location: TBD

The location for ES #26 will be determined based on growth at the time when enrollment nears capacity at the district’s 25 elementary schools.

 

Justin Replacement

  • Existing smaller-sized school could be used as new Early Childhood Center.

  • New school would be constructed to align with the district’s current elementary design and offerings.

Potential Opening: 2025-26

Location: at new site near current Justin ES

 

Prairie View Replacement

  • Existing smaller-sized school could be used as new Early Childhood Center.

  • New school would be constructed to align with the district’s current elementary design and offerings.

Potential Opening: 2026-27

Location: Behind current Prairie View ES

The new school will have an entrance off Chisholm Creek Parkway to alleviate traffic on F.M. 3433.

 

Map may not show exact location and is for reference purposes only.

 

Early Childhood Centers (4)

Four early childhood learning centers would be built across Northwest ISD, one in each geographic area of the district. To best use resources, the existing sites of Justin and Prairie View elementary schools would be used for two of these sites. The district owns land near Cox Elementary School, and if that site is determined to be appropriate for an early childhood center, it could possibly be used, and a fourth location will be determined in the southern portion of the district. These facilities would also provide staff daycare to attract high-quality educators to Northwest ISD.

Potential Openings: 2026-2028

Locations:

  1. current Justin ES

  2. current Prairie View ES

  3. considering a site near cox ES

  4. Tbd in southern portion of Nisd

Site for Early Childhood Center #1 - Current Justin Elementary

 

Site for Early Childhood Center #2 - Current Prairie View Elementary

 

Potential Site for Early Childhood Center #3 - Land Owned near Cox Elementary

 

Maps may not show exact locations and is for reference purposes only.

Site for Early Childhood Center #4 - TBD (likely somewhere in the southern portion of the school district)